Customer needed a set of boat stands with a custom height and was full welded. Customer also wanted an increase to Factor of Safety so the main uprights were sized up to 1/4" wall thickness.
Lead time was 3 weeks better then Brownell Systems.
Customer needed two sets of pontoon dolly's at a custom height and was light weight (U-channel also makes a nifty tool holder). Cost per dolly was within range of the competition but with a greatly smaller lead time.
Customer needed two outboard engine stands in a pitch. Had some left over stock and went to work.
Building boat racks out of reused boat shelves.
Railing was smashed in during a fork truck move and required repair. Customer needed it to look professional, not perfect so socket welds were the choice design.
Location of crack was on starboard tube, starboard side, at the first girth seam (stern of boat).
Someone had a bad day out on the lake and needed a repair to get through the rest of the summer.